Reference Data
BCISM Costbook 2022
Data Kos Pembinaan Malaysia / Malaysian Construction Cost Data ยท Source: N3C CIDB
2.7 Kadar Upah Buruh / Labour Wage Rates
Kadar untuk pekerja tempatan purata 8 jam/hari tidak termasuk kerja lebih masa
| Tred / Trade | Spesifikasi | Selangor | Penang | Johor | Kota Kinabalu | Kuching |
|---|---|---|---|---|---|---|
| Barbender | Skilled | 160.00 | 150.00 | 180.00 | 150.00 | 130.00 |
| Bricklayer | Skilled | 170.00 | 120.00 | 130.00 | 130.00 | 130.00 |
| Concretor | Skilled | 160.00 | 120.00 | 140.00 | 140.00 | 120.00 |
| Excavator operator | Skilled | 200.00 | 150.00 | 200.00 | 120.00 | 120.00 |
| General construction worker | Semi-skilled | 100.00 | 100.00 | 100.00 | 100.00 | 100.00 |
| IBS precast concrete installer | Skilled | 200.00 | 150.00 | 200.00 | 230.00 | 210.00 |
| Painter | Skilled | 160.00 | 140.00 | 160.00 | 130.00 | 130.00 |
| Plasterer | Skilled | 170.00 | 150.00 | 170.00 | 140.00 | 130.00 |
| Plumber (building & sanitary) | Skilled | 200.00 | 150.00 | 190.00 | 140.00 | 130.00 |
| Steel structure fabricator | Skilled | 180.00 | 160.00 | 200.00 | 160.00 | 140.00 |