Project

Projek Lebuh Raya Pantai Timur 3

Active

JKR Malaysia · Pahang · CIDB CIDB-PHG-2026-000341

Bajet / Budget

RM 520,000,000.00

Anggaran Kos / Est. Cost

RM 18,931,656.80

Levi CIDB (0.125%)

RM 23,664.57

Jumlah + Levi / Total

RM 18,955,321.37

Varians / Variance

RM 501,044,678.63

Penggunaan / Used

3.65%

Pecahan Kos / Cost Breakdown

87%

RM 2,321.20

Bahan / Materials

8%

RM 222.40

Buruh / Labour

5%

RM 128.40

Jentera / Equipment

Kadar Binaan / Build-Up Rates

3
Description Category Unit Qty Rate Amount Status Actions
Galian Tanah Biasa (Ordinary Earth Excavat... Ground Work & Earthworks m3 185,000.00 RM 28.79 RM 5,325,868.80 Approved Edit Delete
Konkrit Gred 40 Jambatan (Grade 40 Bridge ... In-Situ Concrete Works m3 8,500.00 RM 507.73 RM 4,315,701.60 Reviewed Edit Delete
Parit Konkrit Bertetulang (RC Box Culvert) Drainage & External Works m 3,200.00 RM 2,903.15 RM 9,290,086.40 Reviewed Edit Delete
Grand Total: RM 18,931,656.80