Konkrit Gred 40 Jambatan (Grade 40 Bridge Concrete)
Section D - In-Situ Concrete Works
m3
Kuantiti: 8,500.00
SMM: D.1.1
CON-G40-BR
Materials
RM 321.20
Labour
RM 51.00
Equipment
RM 22.00
Direct Cost
RM 394.20
OH 12.0%
RM 47.30
Margin 15.0%
RM 66.23
Total Rate
RM 507.73
Materials 81.5%
Labour 12.9%
Equipment 5.6%
Rate Items
4Tambah Item / Add Rate Item
Sejarah Kadar / Rate History
Created
Mar 11, 2026 06:25
RM 0.00
RM 507.73