Build-Up Rates
Taman Industri Senai Phase 3
| Description | Category | Unit | Rate | Amount | Status |
|---|---|---|---|---|---|
| Konkrit Gred 30 Tapak (Grade 30 Foundation Concrete) | In-Situ Concrete Works | m3 | RM 401.86 | RM 2,089,651.20 | Reviewed |
| Rangka Besi Kilang (Factory Steel Portal Frame) | Structural Steelwork & Metalwork | ton | RM 11,624.79 | RM 7,904,859.65 | Approved |
| Bumbung Kepingan Logam (Metal Deck Roofing) | Roofing | m2 | RM 92.85 | RM 1,346,339.50 | Reviewed |
| Saliran & Longkang (Drainage & Drains) | Drainage & External Works | m | RM 120.49 | RM 337,375.50 | Draft |