Build-Up Rates

Taman Industri Senai Phase 3

Description Category Unit Rate Amount Status
Konkrit Gred 30 Tapak (Grade 30 Foundation Concrete) In-Situ Concrete Works m3 RM 401.86 RM 2,089,651.20 Reviewed
Rangka Besi Kilang (Factory Steel Portal Frame) Structural Steelwork & Metalwork ton RM 11,624.79 RM 7,904,859.65 Approved
Bumbung Kepingan Logam (Metal Deck Roofing) Roofing m2 RM 92.85 RM 1,346,339.50 Reviewed
Saliran & Longkang (Drainage & Drains) Drainage & External Works m RM 120.49 RM 337,375.50 Draft