Project
Taman Industri Senai Phase 3
ActiveIskandar Investment Bhd · Johor · CIDB CIDB-JHR-2026-000892
Bajet / Budget
RM 68,000,000.00
Anggaran Kos / Est. Cost
RM 11,678,225.85
Levi CIDB (0.125%)
RM 14,597.78
Jumlah + Levi / Total
RM 11,692,823.63
Varians / Variance
RM 56,307,176.37
Penggunaan / Used
17.2%
Pecahan Kos / Cost Breakdown
70%
RM 6,467.05
Bahan / Materials
23%
RM 2,089.60
Buruh / Labour
8%
RM 720.00
Jentera / Equipment
Kadar Binaan / Build-Up Rates
4| Description | Category | Unit | Qty | Rate | Amount | Status | Actions |
|---|---|---|---|---|---|---|---|
| Konkrit Gred 30 Tapak (Grade 30 Foundation... | In-Situ Concrete Works | m3 | 5,200.00 | RM 401.86 | RM 2,089,651.20 | Reviewed | Edit Delete |
| Rangka Besi Kilang (Factory Steel Portal F... | Structural Steelwork & Metalwork | ton | 680.00 | RM 11,624.79 | RM 7,904,859.65 | Approved | Edit Delete |
| Bumbung Kepingan Logam (Metal Deck Roofing) | Roofing | m2 | 14,500.00 | RM 92.85 | RM 1,346,339.50 | Reviewed | Edit Delete |
| Saliran & Longkang (Drainage & Drains) | Drainage & External Works | m | 2,800.00 | RM 120.49 | RM 337,375.50 | Draft | Edit Delete |
| Grand Total: | RM 11,678,225.85 | ||||||