Project

Taman Industri Senai Phase 3

Active

Iskandar Investment Bhd · Johor · CIDB CIDB-JHR-2026-000892

Bajet / Budget

RM 68,000,000.00

Anggaran Kos / Est. Cost

RM 11,678,225.85

Levi CIDB (0.125%)

RM 14,597.78

Jumlah + Levi / Total

RM 11,692,823.63

Varians / Variance

RM 56,307,176.37

Penggunaan / Used

17.2%

Pecahan Kos / Cost Breakdown

70%

RM 6,467.05

Bahan / Materials

23%

RM 2,089.60

Buruh / Labour

8%

RM 720.00

Jentera / Equipment

Kadar Binaan / Build-Up Rates

4
Description Category Unit Qty Rate Amount Status Actions
Konkrit Gred 30 Tapak (Grade 30 Foundation... In-Situ Concrete Works m3 5,200.00 RM 401.86 RM 2,089,651.20 Reviewed Edit Delete
Rangka Besi Kilang (Factory Steel Portal F... Structural Steelwork & Metalwork ton 680.00 RM 11,624.79 RM 7,904,859.65 Approved Edit Delete
Bumbung Kepingan Logam (Metal Deck Roofing) Roofing m2 14,500.00 RM 92.85 RM 1,346,339.50 Reviewed Edit Delete
Saliran & Longkang (Drainage & Drains) Drainage & External Works m 2,800.00 RM 120.49 RM 337,375.50 Draft Edit Delete
Grand Total: RM 11,678,225.85