Galian Tanah Biasa (Ordinary Earth Excavation)
Unit: m3 · Qty: 185000.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 1 |
Galian jentera (Machine excavation) |
m3 |
1.00 |
100% |
— |
RM 8.00 |
RM 8.00 |
EQ
|
| 2 |
Buang ke tapak pelupusan (Disposal to dump site) |
m3 |
1.20 |
100% |
— |
RM 12.00 |
RM 12.00 |
EQ
|
| 3 |
Pekerja (Labour) |
m3 |
0.02 |
100% |
— |
RM 70.00 |
RM 70.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 23.80 |
|
| + OH (8.0%) + Margin (12.0%): |
RM 4.99 |
|
| KADAR / RATE per m3: |
RM 28.79 |
|
Konkrit Gred 40 Jambatan (Grade 40 Bridge Concrete)
Unit: m3 · Qty: 8500.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 4 |
Konkrit Gred 40 (Grade 40 concrete) |
m3 |
1.08 |
100% |
— |
RM 290.00 |
RM 290.00 |
MA
|
| 5 |
Pam & penempatan (Pump & placement) |
m3 |
1.00 |
100% |
— |
RM 22.00 |
RM 22.00 |
EQ
|
| 6 |
Kumpulan konkrit (Concrete gang) |
m3 |
0.60 |
100% |
— |
RM 85.00 |
RM 85.00 |
LA
|
| 7 |
Pengawetan & ujian (Curing & testing) |
m3 |
1.00 |
100% |
— |
RM 8.00 |
RM 8.00 |
MA
|
| Kos Langsung / Direct Cost: |
RM 394.20 |
|
| + OH (12.0%) + Margin (15.0%): |
RM 113.53 |
|
| KADAR / RATE per m3: |
RM 507.73 |
|
Parit Konkrit Bertetulang (RC Box Culvert)
Unit: m · Qty: 3200.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 8 |
Konkrit Gred 30 (Grade 30 concrete) |
m |
2.50 |
100% |
— |
RM 240.00 |
RM 240.00 |
MA
|
| 9 |
Tetulang keluli (Steel reinforcement) |
m |
0.35 |
100% |
— |
RM 3,200.00 |
RM 3,200.00 |
MA
|
| 10 |
Acuan (Formwork) |
m |
8.00 |
100% |
— |
RM 35.00 |
RM 35.00 |
MA
|
| 11 |
Galian (Excavation) |
m |
4.00 |
100% |
— |
RM 15.00 |
RM 15.00 |
EQ
|
| 12 |
Kambus balik (Backfill) |
m |
2.00 |
100% |
— |
RM 12.00 |
RM 12.00 |
EQ
|
| 13 |
Buruh (Labour) |
m |
2.00 |
100% |
— |
RM 85.00 |
RM 85.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 2,254.00 |
|
| + OH (12.0%) + Margin (15.0%): |
RM 649.15 |
|
| KADAR / RATE per m: |
RM 2,903.15 |
|
Total Rates in Project
3 items
JUMLAH BESAR / GRAND TOTAL
RM 18,931,656.80