Acuan Papan Lapis Lantai (Plywood Slab Formwork)
Unit: m2 · Qty: 52000.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 1 |
Papan lapis 18mm (18mm plywood) |
m2 |
0.35 |
100% |
— |
RM 45.00 |
RM 45.00 |
MA
|
| 2 |
Kayu sokongan (Timber support/props) |
m2 |
0.15 |
100% |
— |
RM 35.00 |
RM 35.00 |
MA
|
| 3 |
Paku & aksesori (Nails & accessories) |
m2 |
1.00 |
100% |
— |
RM 2.50 |
RM 2.50 |
MA
|
| 4 |
Tukang kayu (Carpenter) |
m2 |
0.12 |
100% |
— |
RM 130.00 |
RM 130.00 |
LA
|
| 5 |
Pekerja am (General worker) |
m2 |
0.08 |
100% |
— |
RM 70.00 |
RM 70.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 44.70 |
|
| + OH (10.0%) + Margin (15.0%): |
RM 11.85 |
|
| KADAR / RATE per m2: |
RM 56.55 |
|
Cat Emulsi Dalaman 2 Lapis (Internal 2 Coats Emulsion Paint)
Unit: m2 · Qty: 85000.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 6 |
Sealer/primer (Primer/sealer) |
m2 |
0.12 |
100% |
— |
RM 18.00 |
RM 18.00 |
MA
|
| 7 |
Cat emulsi (Emulsion paint) |
m2 |
0.25 |
100% |
— |
RM 22.00 |
RM 22.00 |
MA
|
| 8 |
Tukang cat (Painter) |
m2 |
0.06 |
100% |
— |
RM 110.00 |
RM 110.00 |
LA
|
| 9 |
Kertas pasir & alatan (Sandpaper & tools) |
m2 |
1.00 |
100% |
— |
RM 1.20 |
RM 1.20 |
MA
|
| Kos Langsung / Direct Cost: |
RM 15.46 |
|
| + OH (8.0%) + Margin (12.0%): |
RM 3.24 |
|
| KADAR / RATE per m2: |
RM 18.70 |
|
Dinding Blok Konkrit 150mm (150mm Concrete Block Wall)
Unit: m2 · Qty: 28000.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 10 |
Blok konkrit 150mm (150mm concrete block) |
m2 |
12.50 |
100% |
— |
RM 2.80 |
RM 2.80 |
MA
|
| 11 |
Mortar simen 1:4 (Cement mortar 1:4) |
m2 |
0.02 |
100% |
— |
RM 350.00 |
RM 350.00 |
MA
|
| 12 |
Tukang batu (Mason) |
m2 |
0.22 |
100% |
— |
RM 120.00 |
RM 120.00 |
LA
|
| 13 |
Pekerja am (Helper) |
m2 |
0.22 |
100% |
— |
RM 70.00 |
RM 70.00 |
LA
|
| 14 |
Perancah (Scaffolding) |
m2 |
1.00 |
100% |
— |
RM 3.50 |
RM 3.50 |
EQ
|
| Kos Langsung / Direct Cost: |
RM 86.60 |
|
| + OH (10.0%) + Margin (12.0%): |
RM 20.09 |
|
| KADAR / RATE per m2: |
RM 106.69 |
|
Jubin Homogeneous 600x600mm (600x600mm Homogeneous Floor Tiles)
Unit: m2 · Qty: 32000.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 15 |
Jubin homogeneous 600x600 (600x600 homogeneous tiles) |
m2 |
1.10 |
100% |
— |
RM 38.00 |
RM 38.00 |
MA
|
| 16 |
Perekat jubin (Tile adhesive) |
m2 |
0.50 |
100% |
— |
RM 14.00 |
RM 14.00 |
MA
|
| 17 |
Grout (Grout) |
m2 |
0.30 |
100% |
— |
RM 8.00 |
RM 8.00 |
MA
|
| 18 |
Tukang jubin mahir (Skilled tiler) |
m2 |
0.25 |
100% |
— |
RM 140.00 |
RM 140.00 |
LA
|
| 19 |
Pekerja am (Helper) |
m2 |
0.12 |
100% |
— |
RM 70.00 |
RM 70.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 94.60 |
|
| + OH (10.0%) + Margin (15.0%): |
RM 25.07 |
|
| KADAR / RATE per m2: |
RM 119.67 |
|
Kalis Air Bilik Air (Bathroom Waterproofing)
Unit: m2 · Qty: 4500.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 20 |
Membran kalis air (Waterproofing membrane) |
m2 |
1.10 |
100% |
— |
RM 18.00 |
RM 18.00 |
MA
|
| 21 |
Primer (Primer coat) |
m2 |
1.00 |
100% |
— |
RM 5.00 |
RM 5.00 |
MA
|
| 22 |
Lapisan pelindung (Protection screed) |
m2 |
1.00 |
100% |
— |
RM 8.00 |
RM 8.00 |
MA
|
| 23 |
Tukang kalis air (Waterproofing applicator) |
m2 |
0.15 |
100% |
— |
RM 130.00 |
RM 130.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 52.30 |
|
| + OH (10.0%) + Margin (15.0%): |
RM 13.86 |
|
| KADAR / RATE per m2: |
RM 66.16 |
|
Konkrit Gred 40 Siap Tuang (Grade 40 Concrete Supply & Pour)
Unit: m3 · Qty: 14500.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 24 |
Konkrit sedia campur Gred 40 (Ready-mix concrete Grade 40) |
m3 |
1.05 |
100% |
— |
RM 280.00 |
RM 280.00 |
MA
|
| 25 |
Pam konkrit (Concrete pump) |
m3 |
1.00 |
100% |
— |
RM 18.00 |
RM 18.00 |
EQ
|
| 26 |
Kumpulan pekerja konkrit 6 orang (Concrete gang) |
m3 |
0.50 |
100% |
— |
RM 85.00 |
RM 85.00 |
LA
|
| 27 |
Bahan pengawetan (Curing compound) |
m3 |
0.30 |
100% |
— |
RM 12.00 |
RM 12.00 |
MA
|
| 28 |
Ujian kiub & QC (Cube test & QC) |
m3 |
1.00 |
100% |
— |
RM 6.00 |
RM 6.00 |
OT
|
| Kos Langsung / Direct Cost: |
RM 364.10 |
|
| + OH (10.0%) + Margin (15.0%): |
RM 96.49 |
|
| KADAR / RATE per m3: |
RM 460.59 |
|
Plaster Simen 20mm (20mm Cement Sand Plaster)
Unit: m2 · Qty: 55000.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 29 |
Simen (Cement) |
m2 |
0.30 |
100% |
— |
RM 22.00 |
RM 22.00 |
MA
|
| 30 |
Pasir (Sand) |
m2 |
0.01 |
100% |
— |
RM 85.00 |
RM 85.00 |
MA
|
| 31 |
Tukang plaster (Plasterer) |
m2 |
0.15 |
100% |
— |
RM 120.00 |
RM 120.00 |
LA
|
| 32 |
Pekerja am (Helper) |
m2 |
0.08 |
100% |
— |
RM 70.00 |
RM 70.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 31.22 |
|
| + OH (10.0%) + Margin (12.0%): |
RM 7.24 |
|
| KADAR / RATE per m2: |
RM 38.46 |
|
Tetulang Keluli T12-T32 Gred 500 (Steel Reinforcement T12-T32 Grade 500)
Unit: ton · Qty: 3800.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 33 |
Bar keluli Gred 500 (Grade 500 steel bar) |
ton |
1.03 |
100% |
— |
RM 2,650.00 |
RM 2,650.00 |
MA
|
| 34 |
Potong & bengkok (Cutting & bending) |
ton |
1.00 |
100% |
— |
RM 120.00 |
RM 120.00 |
LA
|
| 35 |
Ikat & pasang (Fixing crew) |
ton |
1.00 |
100% |
— |
RM 280.00 |
RM 280.00 |
LA
|
| 36 |
Dawai pengikat & spacer (Tying wire & spacers) |
ton |
1.00 |
100% |
— |
RM 35.00 |
RM 35.00 |
MA
|
| 37 |
Kren (Crane usage) |
ton |
0.50 |
100% |
— |
RM 65.00 |
RM 65.00 |
EQ
|
| Kos Langsung / Direct Cost: |
RM 3,197.00 |
|
| + OH (10.0%) + Margin (15.0%): |
RM 847.21 |
|
| KADAR / RATE per ton: |
RM 4,044.21 |
|
Total Rates in Project
8 items
JUMLAH BESAR / GRAND TOTAL
RM 35,806,331.16
Disediakan Oleh
Prepared By
Diluluskan Oleh
Approved By