| No | Description | Unit | Qty | Waste % | Comp Factor |
Basic Rate |
Unit Rate |
Code |
|---|---|---|---|---|---|---|---|---|
| 1 | Clay bricks | nos | 114.00 | 105% | — | RM 0.32 | RM 0.34 | MB |
| 2 | Kumat (wire mesh) | m2 | 6.66 | 105% | — | RM 0.13 | RM 0.14 | CM |
| 3 | Cement | kg | 410.28 | 105% | 1.25 | RM 0.29 | RM 0.38 | CM |
| 4 | Fine Sand | m3 | 1.72 | 105% | 1.25 | RM 51.08 | RM 67.04 | CW |
| 5 | Water | nos | 54.00 | 105% | — | RM 0.00 | RM 0.00 | CM |
| 6 | Labour | nos | 114.00 | 100% | — | RM 0.15 | RM 0.15 | Lab |
| Materials Subtotal: | RM 310.69 | |||||||
| Labour Subtotal: | RM 17.10 | |||||||
| Jumlah Kos Langsung / Direct Cost: | RM 327.79 | |||||||