Konkrit Gred 35 Struktur (Grade 35 Structural Concrete)
Unit: m3 · Qty: 3200.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 1 |
Konkrit sedia campur Gred 35 (Ready-mix Grade 35) |
m3 |
1.05 |
100% |
— |
RM 260.00 |
RM 260.00 |
MA
|
| 2 |
Pam konkrit (Concrete pump) |
m3 |
1.00 |
100% |
— |
RM 16.00 |
RM 16.00 |
EQ
|
| 3 |
Kumpulan konkrit (Concrete gang) |
m3 |
0.50 |
100% |
— |
RM 82.00 |
RM 82.00 |
LA
|
| 4 |
Ujian & QC (Testing & QC) |
m3 |
1.00 |
100% |
— |
RM 5.50 |
RM 5.50 |
OT
|
| Kos Langsung / Direct Cost: |
RM 335.50 |
|
| + OH (10.0%) + Margin (12.0%): |
RM 77.84 |
|
| KADAR / RATE per m3: |
RM 413.34 |
|
Paip Air Panas & Sejuk PPR (PPR Hot & Cold Water Piping)
Unit: m · Qty: 4800.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 5 |
Paip PPR (PPR pipe) |
m |
1.10 |
100% |
— |
RM 14.00 |
RM 14.00 |
MA
|
| 6 |
Kelengkapan & injap (Fittings & valves) |
m |
0.30 |
100% |
— |
RM 25.00 |
RM 25.00 |
MA
|
| 7 |
Penebat (Insulation) |
m |
1.00 |
100% |
— |
RM 6.00 |
RM 6.00 |
MA
|
| 8 |
Tukang paip (Plumber) |
m |
0.12 |
100% |
— |
RM 140.00 |
RM 140.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 45.70 |
|
| + OH (10.0%) + Margin (15.0%): |
RM 12.11 |
|
| KADAR / RATE per m: |
RM 57.81 |
|
Pendawaian Elektrik Fasa Pertama (Electrical First Fix Wiring)
Unit: m2 · Qty: 9500.00
| No |
Description |
Unit |
Qty |
Waste |
Comp |
Basic Rate |
Unit Rate |
Code |
| 9 |
Konduit & kelengkapan (Conduit & fittings) |
m2 |
2.50 |
100% |
— |
RM 6.00 |
RM 6.00 |
MA
|
| 10 |
Kabel pelbagai saiz (Wiring various sizes) |
m2 |
4.00 |
100% |
— |
RM 3.50 |
RM 3.50 |
MA
|
| 11 |
Kotak soket (Back boxes) |
m2 |
0.25 |
100% |
— |
RM 8.00 |
RM 8.00 |
MA
|
| 12 |
Juruletrik (Electrician) |
m2 |
0.18 |
100% |
— |
RM 150.00 |
RM 150.00 |
LA
|
| 13 |
Pekerja am (Helper) |
m2 |
0.12 |
100% |
— |
RM 70.00 |
RM 70.00 |
LA
|
| Kos Langsung / Direct Cost: |
RM 66.40 |
|
| + OH (10.0%) + Margin (15.0%): |
RM 17.60 |
|
| KADAR / RATE per m2: |
RM 84.00 |
|
Total Rates in Project
3 items
JUMLAH BESAR / GRAND TOTAL
RM 2,398,127.60
Disediakan Oleh
Prepared By
Diluluskan Oleh
Approved By