| No | Description | Unit | Qty | Waste % | Comp Factor |
Basic Rate |
Unit Rate |
Code |
|---|---|---|---|---|---|---|---|---|
| 1 | Konkrit sedia campur Gred 30 (Ready-mix Grade 30) | m3 | 1.05 | 100% | — | RM 240.00 | RM 240.00 | MB |
| 2 | Kumpulan konkrit (Concrete gang) | m3 | 0.50 | 100% | — | RM 80.00 | RM 80.00 | Lab |
| 3 | Pam konkrit (Concrete pump) | m3 | 1.00 | 100% | — | RM 15.00 | RM 15.00 | Eq |
| 4 | Ujian kiub (Cube test) | m3 | 1.00 | 100% | — | RM 5.00 | RM 5.00 | Eq |
| Materials Subtotal: | RM 252.00 | |||||||
| Labour Subtotal: | RM 40.00 | |||||||
| Equipment Subtotal: | RM 20.00 | |||||||
| Jumlah Kos Langsung / Direct Cost: | RM 312.00 | |||||||