| No | Description | Unit | Qty | Waste % | Comp Factor |
Basic Rate |
Unit Rate |
Code |
|---|---|---|---|---|---|---|---|---|
| 1 | Jubin homogeneous 600x600 (600x600 homogeneous tiles) | m2 | 1.10 | 100% | — | RM 38.00 | RM 38.00 | MB |
| 2 | Perekat jubin (Tile adhesive) | m2 | 0.50 | 100% | — | RM 14.00 | RM 14.00 | MB |
| 3 | Grout (Grout) | m2 | 0.30 | 100% | — | RM 8.00 | RM 8.00 | MB |
| 4 | Tukang jubin mahir (Skilled tiler) | m2 | 0.25 | 100% | — | RM 140.00 | RM 140.00 | Lab |
| 5 | Pekerja am (Helper) | m2 | 0.12 | 100% | — | RM 70.00 | RM 70.00 | Lab |
| Materials Subtotal: | RM 51.20 | |||||||
| Labour Subtotal: | RM 43.40 | |||||||
| Jumlah Kos Langsung / Direct Cost: | RM 94.60 | |||||||