| No | Description | Unit | Qty | Waste % | Comp Factor |
Basic Rate |
Unit Rate |
Code |
|---|---|---|---|---|---|---|---|---|
| 1 | Simen (Cement) | m2 | 0.30 | 100% | — | RM 22.00 | RM 22.00 | MB |
| 2 | Pasir (Sand) | m2 | 0.01 | 100% | — | RM 85.00 | RM 85.00 | MB |
| 3 | Tukang plaster (Plasterer) | m2 | 0.15 | 100% | — | RM 120.00 | RM 120.00 | Lab |
| 4 | Pekerja am (Helper) | m2 | 0.08 | 100% | — | RM 70.00 | RM 70.00 | Lab |
| Materials Subtotal: | RM 7.62 | |||||||
| Labour Subtotal: | RM 23.60 | |||||||
| Jumlah Kos Langsung / Direct Cost: | RM 31.22 | |||||||