CIDB KPA Build-Up Rate Report
Back to Rate

Build-up Rate

Analisis Kadar Binaan / Rate Build-Up Analysis

Project: Menara Laksamana KL
Client: UEM Sunrise Bhd
Location: Wilayah Persekutuan Kuala Lumpur
SMM Ref: F.1.1
Trade Code: RBR-HT
Date: March 2026
Tetulang Keluli T12-T32 Gred 500 (Steel Reinforcement T12-T32 Grade 500)
No Description Unit Qty Waste % Comp
Factor
Basic
Rate
Unit
Rate
Code
1 Bar keluli Gred 500 (Grade 500 steel bar) ton 1.03 100% RM 2,650.00 RM 2,650.00 MB
2 Dawai pengikat & spacer (Tying wire & spacers) ton 1.00 100% RM 35.00 RM 35.00 MB
3 Potong & bengkok (Cutting & bending) ton 1.00 100% RM 120.00 RM 120.00 Lab
4 Ikat & pasang (Fixing crew) ton 1.00 100% RM 280.00 RM 280.00 Lab
5 Kren (Crane usage) ton 0.50 100% RM 65.00 RM 65.00 Eq
Materials Subtotal: RM 2,764.50
Labour Subtotal: RM 400.00
Equipment Subtotal: RM 32.50
Jumlah Kos Langsung / Direct Cost: RM 3,197.00
Kos Bahan / Material Cost RM 2,764.50
Kos Buruh / Labour Cost RM 400.00
Kos Peralatan / Equipment Cost RM 32.50
Jumlah Kos Langsung / Direct Cost RM 3,197.00
Overhed / Overhead (10.0%) RM 319.70
Keuntungan / Profit Margin (15.0%) RM 527.51
KADAR SEUNIT / UNIT RATE (ton) RM 4,044.21
Disediakan Oleh
Prepared By
Disemak Oleh
Checked By
Diluluskan Oleh
Approved By