| No | Description | Unit | Qty | Waste % | Comp Factor |
Basic Rate |
Unit Rate |
Code |
|---|---|---|---|---|---|---|---|---|
| 1 | Bar keluli Gred 500 (Grade 500 steel bar) | ton | 1.03 | 100% | — | RM 2,650.00 | RM 2,650.00 | MB |
| 2 | Dawai pengikat & spacer (Tying wire & spacers) | ton | 1.00 | 100% | — | RM 35.00 | RM 35.00 | MB |
| 3 | Potong & bengkok (Cutting & bending) | ton | 1.00 | 100% | — | RM 120.00 | RM 120.00 | Lab |
| 4 | Ikat & pasang (Fixing crew) | ton | 1.00 | 100% | — | RM 280.00 | RM 280.00 | Lab |
| 5 | Kren (Crane usage) | ton | 0.50 | 100% | — | RM 65.00 | RM 65.00 | Eq |
| Materials Subtotal: | RM 2,764.50 | |||||||
| Labour Subtotal: | RM 400.00 | |||||||
| Equipment Subtotal: | RM 32.50 | |||||||
| Jumlah Kos Langsung / Direct Cost: | RM 3,197.00 | |||||||