| No | Description | Unit | Qty | Waste % | Comp Factor |
Basic Rate |
Unit Rate |
Code |
|---|---|---|---|---|---|---|---|---|
| 1 | Papan lapis 18mm (18mm plywood) | m2 | 0.35 | 100% | — | RM 45.00 | RM 45.00 | MB |
| 2 | Kayu sokongan (Timber support/props) | m2 | 0.15 | 100% | — | RM 35.00 | RM 35.00 | MB |
| 3 | Paku & aksesori (Nails & accessories) | m2 | 1.00 | 100% | — | RM 2.50 | RM 2.50 | MB |
| 4 | Tukang kayu (Carpenter) | m2 | 0.12 | 100% | — | RM 130.00 | RM 130.00 | Lab |
| 5 | Pekerja am (General worker) | m2 | 0.08 | 100% | — | RM 70.00 | RM 70.00 | Lab |
| Materials Subtotal: | RM 23.50 | |||||||
| Labour Subtotal: | RM 21.20 | |||||||
| Jumlah Kos Langsung / Direct Cost: | RM 44.70 | |||||||