Section 4.3
Pengiraan Kadar Binaan / Built-Up Rate Calculator
Kira kadar menggunakan kos bahan, buruh dan jentera dengan pemalar BCISM
Rujukan Upah Buruh / Labour Rates (RM/day)
Barbender
160
Bricklayer
170
Concretor
160
Excavator operator
200
General construction worker
100
IBS precast concrete installer
200
Painter
160
Plasterer
170
Plumber (building & sanitary)
200
Steel structure fabricator
180
Rujukan Jentera / Machinery (RM/day)
Backhoe loader
380.0
Bulldozer
540.0
Dump truck
360.0
Lorry
200.0
Mini hydraulic excavator
370.0
Mobile crane
510.0
Motor grader
750.0
Vibratory compactor
410.0
Pemalar / Constants
Brickwork
1.38 m²/man-hour
Concrete
0.67 m³/man-hour
Floor tiling
1.29 m²/man-hour
Formwork
3.29 m²/man-hour
Painting
10.6 m²/man-hour
Paving
2.87 m²/man-hour
Reinforcement
44.8 kg/man-hour
Wall plaster
1.08 m²/man-hour
Wall tiling
0.84 m²/man-hour
Asphalt paver 10-20 tonnes
330.88 m²/plant-hour
Dump truck 10 wheels
7.96 m³/plant-hour
Excavator 20-30 tonnes
72.15 m³/plant-hour
Mobile crane 20-30 tonnes
10.55 tonne/plant-hour
Piling driving
14.29 m/plant-hour
Road roller tandem compactor 4,000kg
457.82 m²/plant-hour
Tower crane 1-2 tonnes
12.07 tonne/plant-hour